Jordan 30TPH Coal Powder Preparation Line

Material: Coal

Input Size: ≦35mm

Output Size: R0.08=5%-10%

Daily Operation: 24h

Application: Coal powder preparation

Equipment: a set of LM190 mill system

Customer Feedback

What we are doing is a turnkey project. SBM has helped us fulfill our expectations perfectly through rigorous overall schematic design, equipment selection and construction as well as high efficiency. On the whole, the equipment runs very stably with output up to expectations; we are looking forward to the subsequent cooperation in future. ---A project engineering director of the company

Production Process

208-4

Customer site
Related Case

Vietnam 12T/H Coal Powder Preparation Line

Daily operation: 24 hours Feeding-in material: coal Grinding particle size: <=35mm Finished product: coal injection, R0.08=10%-12%

Sichuan 50TPH Coal Grinding Line

Daily operation: 8 hours Feeding-in material: washing coal of Panzhihua Finished product: 100-200 mesh pulverized coal for blast - furnace injection coal