Each crushing and screening module is supported by an independent frame. Production can begin once the chassis is leveled.
The MK adopts integrated modular design, and can be hoisted and transported as a whole, achieving rapid assembly and production within 12 to 48 hours.
The framework design and the maintenance platform provide sufficient maintenance space, which ensures the convenience of on-site checks and maintenance.
MK adopts integrated automatic electrical control system. The separate module can be started or stopped by only pressing one button.
leave your message here, we'll send you
an Email immediately.